All workflows
Compliance & Assurance~15 minutesintermediate1 AI step

Assess and create temporary works items

Work out what temporary works your project needs from the drawings and programme, then get a BS 5975 register entry raised for each one, ready to design-check, sign off and inspect.

What you walk away with: A temporary works schedule read out of your drawings and programme against UK guidance (BS 5975:2019, CIRIA, the TWf and HSE), with a compliant register entry created for each item. Every item carries its details, sign-offs under BS 5975, and links to the package and RAMS it belongs to, so the temporary works co-ordinator can see what needs designing, checking and inspecting — and you have a register you can defend at audit.

The 5 steps

Expand any step for the detail - guides for the steps you do, the inputs and outputs for the steps PlanOps runs.

Set up once per project

Do these the first time only. Already set up? Skip straight to the steps.

Steps marked AI task are done for you by a PlanOps assistant.

Written for: temporary works coordinator, project manager, health and safety manager

A temporary works register with an item raised for every temporary works the project needs, each linked to its package and RAMS and ready for sign-off.

Start free with 50 Intelligence Units. Every step here works on day one.

Start free